(2022, September 6). A dustup over height in the low-slung Annex. The Globe and Mail.
The Globe and Mail’s “Architourist”, Dave LeBlanc, takes aim at the precedent that will be set for The Annex by the demolition/development of 145 St. George St.
The Globe and Mail’s “Architourist”, Dave LeBlanc, takes aim at the precedent that will be set for The Annex by the demolition/development of 145 St. George St.